Geomembranes installation
By generating, installing liners must follow the following procedure:
• Verification of Technical Specifications and Drawings
• Reception area
• Welding (fusion / extrusion)
• Initial Testing
• Welding Panel
• Quality Control
• Delivery Area
equipment
Konidol has new equipment, latest technology, among which include:
• Welding wedge
• Extruder
• Test equipment: pressure testing, vacuum chamber, tensiometer
• Tools under
• Plant
Quality Test
Tests are conducted to the welds made by melting and extrusion, which can be destructive or nondestructive:
• Air Test
• Vacuum chamber
• Stress Test